IEC 61375 PDF

The train communication network (TCN) is a hierarchical combination of two fieldbus for data transmission within trains. It consists of the Multifunction Vehicle Bus (MVB) inside each vehicle and of the Wire Train Bus (WTB) to connect the different vehicles. The TCN components have been standardized in IEC IEC and UIC have now been issued as a set of international standards to overcome this situation: IEC , the Train Communication Network. STANDARD. IEC. First edition. Electric railway equipment –. Train bus –. Part 1: Train Communication Network. Matériel électrique ferroviaire .

Author: Molabar Akikree
Country: Madagascar
Language: English (Spanish)
Genre: History
Published (Last): 10 September 2006
Pages: 468
PDF File Size: 10.73 Mb
ePub File Size: 11.59 Mb
ISBN: 773-9-42029-964-9
Downloads: 57014
Price: Free* [*Free Regsitration Required]
Uploader: Mezitaxe

The medium consists of a duplicated shielded twisted pair cable, which runs in the UIC cables between the vehicles. Rail technologies Serial buses Automation.

The physical level is using transmissions at a 1. The MVB frames are not compatible with IEC fieldbus frames as it omits most of the preamble synchronization which is not required if zero-crossing detection is possible. This separation is not always observed.

Webarchive template archiveis links CS1 German-language sources de. This was intentional as the fight between the field busses raged in the iwc and the decision of the IEC that any of the eight field busses was a standard did not help plug-compatibility. There is no inauguration, the addresses are statically allocated.

Train communication network – Wikipedia

While the WorldFIP, CANopen, Lonworks and Profinet are controlled by international manufacturer associations targeting a wide range of application, MVB was tailored to the rolling stock application, 6175 the goal of plug-compatibility, and therefore allows no options.

  FERNAND BRAUDEL A HISTORY OF CIVILIZATIONS PDF

This explains why MVB and FIP have similar operation cyclic and event-drivenonly the arbitration method in case of multiple access differs, as MVB used a binary bisection mode relying of collision detection while FIP iev a “look-at-me” bit over periodic data.

Technical and de facto standards for wired computer buses. When total cost of ownership is considered, the cost of the hardware elements can easily be outweighed by additional engineering costs in the railways market with its small series. Archived from the original powerpoint on Since connectors are exposed and can oxidize, a current pulse is applied at connection establishment to evaporate the oxide layer, called fritting.

This is not due to the communication technology: Running FlexRay with 2. Vehicles without WTB node “conduction vehicles” are not counted. MVB for critical operation such as traction control and signalling in the driver’s cab, and LON for uncritical and slow data transfer, but low-cost connections such as isc displays and diagnostics. Additionally more and more components are added to rail vehicles that need far more bandwidth than any field bus can provide e.

A unique property of the WTB is the train inauguration Zugtaufe in which the newly connected vehicles receive an address in sequence and can identify the vehicle side called port and starboard like in the marine so that doors open on the correct side.

The frames have a maximum payload of bits. The plugs and sockets are the same as used by Profibus with two 9-pin Sub-D sockets per electrical device. Still all the alternate vehicle buses are connected to the Wire Train Bus.

Train communication network

The WTB also supports sporadic data transmission for diagnostics. The connector between the vehicles is the pole UIC connector.

  KIMMER EXPERIMENT PDF

The difference came from the fieldbus physical layer which assumes a phase-locked loop to decode the Manchester data, requiring a preamble to synthonize the decoder, while Uec operated principally with optical fibres where this method is useless, MVB’s decoding relies on zero-crossing detectors and Manchester pattern recognition.

Interfaces are listed by their speed in the roughly ascending order, so the interface at the end of each section should be the fastest. But railways certification is costly and not always needed for uncritical applications such as comfort and passenger information.

MVB is similar to FlexRayboth have the “process data”, which is called “static segment” in FlexRayand “message data”, which is the “dynamic segment” and are driven by a fixed TDMA scheme.

The WTB operates cyclically to provide deterministic operation, with a period of 25 ms, used mainly for the traction control. The wire train bus has been designed for international passenger trains with variable composition, consisting of up to 22 vehicles.

When two train compositions join, the addresses are reallocated to form a new composition of vehicles with a sequential address. From Wikipedia, the free encyclopedia.

The maximum distance is determined on the restriction of a maximum allowed reply delay of The content of the periodic and sporadic frames is governed by the UIC standard. Retrieved from ” https: